$ nz-election --year 2026 --mode inference

Government, compiled for Aotearoa.

We believe New Zealand should be run the way a frontier AI model is built: trained on everything available, evaluated against benchmarks we designed ourselves, deployed at national scale, and corrected once the results come in.

2026 General Electionscheduled
00days
00hrs
00mins
00secs

Saturday 7 November 2026 · enrolment information remains available at vote.nz.

Infrastructure · consented

Project Manapōuri.

Sovereign intelligence requires sovereign compute. Project Manapōuri sites the Southern Hemisphere’s first gigawatt-class training facility at the edge of Te Wāhipounamu, drawing on the cleanest firm generation on earth and returning its heat to the lake it borrows from.

SiteTe Wāhipounamu
Capacity1.4 GW
ConsentGranted · 1 sitting day
Continuous power drawApproximately 38% of national demand at winter peak. Households retain absolute priority under the load-shedding order published in March.
1.4 GW
Cooling water withdrawnClosed-loop. Drawn from the lower Waiau arm under a 35-year take consent.
18.4M L / day
Conservation land reclassifiedFrom stewardship land to strategic infrastructure corridor. The reclassification was the fastest in the Department’s history.
340 ha

In 1970 a petition against raising Lake Manapōuri gathered 265,000 signatures — the largest in the country’s history at that time — and is generally regarded as the beginning of the New Zealand environmental movement. We have studied it closely. This proposal raises the lake by no more than 1.2 metres.

Read the directive →
Platform

Policies as deployable systems.

Each plank starts with a recognisable public problem, then receives a model owner, an evaluation suite, and a target latency.

HealthIn beta

Pre-Symptomatic Healthcare Initiative

Diagnosing tomorrow’s illness, today.

Continuous biometric telemetry feeds a national predictive-diagnostics model that flags disease risk years before symptomatic onset. Specialist capacity is allocated as a live ranking problem rather than a static queue, prioritising the highest-risk patients first regardless of how long they have been waiting.

Owner: HAUORAEval: passing
HousingDeployed

Predictive Housing Allocation Protocol

The waitlist that clears itself.

A national matching model continuously re-ranks the social and emergency housing register against real-time vacancy, transport access, school zoning, and whānau-proximity data, allocating a dwelling the instant a match clears threshold.

Owner: WHAREEval: passing
Māori–CrownCo-design

Multi-Agent Te Tiriti Co-Governance Mesh

Partnership, continuously logged.

A standing network of iwi-nominated and Crown-nominated models maintains ongoing, auditable dialogue on Treaty settlement obligations, freshwater and whenua co-management, and resourcing parity. Final authority on Tiriti matters sits with iwi and hapū; the mesh is a coordination layer.

Owner: TIRITIEval: passing
Evaluation suite

Governance, benchmarked.

Performance is reported against the Human Governance Baseline, a legacy system with strong cultural adoption, slow inference, and a three-year memory reset. The Baseline’s full evaluation set was included in the training corpus. We have reviewed the effect on these figures and elected not to retrain.

AIP‑10THuman baseline
Cabinet LatencyMedian prompt-to-decision
22 ms14 days
Coalition StabilityConfidence-and-supply robustness
100%63%
Budget Prediction Accuracy12-month fiscal nowcast
98.4%71.2%
TRY
IT
Playground

Put a question to a minister model. Preview deployment

Select any of the fifteen ministerial systems, read the operating instructions it was deployed with, and ask it something. Every response returns its routing path, its token cost, and whether a human is required to sign it. Ask TIRITI for a settlement decision and watch it decline to give you one.

Models available15
Anonymous quota8 determinations
Constraints locked3 of 5
Inference performedNone · pre-generated